Accura Engineering

We build for the
future
Join us in building a better future together!
Open Positions
We build for the
future
Join us in building a better future together!
Open Positions
We build for the
future
Join us in building a better future together!
Open Positions
  • Home
  • »
  • Canopies at North and South Terminal, Hartsfield-Jackson Atlanta International Airport

Canopies at North and South Terminal, Hartsfield-Jackson Atlanta International Airport

Client

Hartsfield-Jackson Atlanta International Airport

Location

Atlanta, GA

Sector

Surveying/SUE

Services

Accura Engineering provided critical surveying and utility mapping services for the construction of new canopies at the North and South terminals of Hartsfield-Jackson Atlanta International Airport. The project required precise data collection to ensure that the new structures integrated seamlessly with the existing airport infrastructure.

Precision, Expertise, and Impact in Action

THIS IS A TEST
THIS IS A TEST
THIS IS A TEST
THIS IS A TEST

Our Role in the Mission

Accura played a key role in wetlands delineation, permitting, and environmental surveys to facilitate the repair and expansion of water and wastewater infrastructure. Our comprehensive approach included:

Conducting on-site investigations to assess environmental impact.

Preparing detailed permit applications for:

  • Stream stabilization/restoration across three critical water bodies&
  • The repair, replacement, and construction of new water and wastewater pipelines, including stream and wetland crossings.

Surveying threatened and endangered species, including the rare small whorled pogonia and wood turtle.

Modifying existing permits to meet updated compliance needs.

Challenges We Overcame

Working across the dynamic landscape of Fort Belvoir required:
Conducting compliance inspections under stringent environmental regulations.
Balancing infrastructure needs with environmental preservation.
Addressing multiple stream and wetland impacts (4-5 in total).

The Impact

Our work not only ensured compliance but also played a part in protecting the delicate ecosystem of Fort Belvoir. From securing permits to restoring streams, we enabled the U.S. Army to move forward with confidence, knowing their construction efforts align with their commitment to environmental stewardship.

SIMILAR CASE STUDIES

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.

OUR Partners