Accura Engineering

We build for the
future
Join us in building a better future together!
Open Positions
We build for the
future
Join us in building a better future together!
Open Positions
We build for the
future
Join us in building a better future together!
Open Positions
  • Home
  • »
  • Centers for Disease Control and Prevention(CDC)

Centers for Disease Control and Prevention(CDC)

Client

Centers for Disease Control and Prevention (CDC)

Location

CDC Chamblee Campus, Atlanta, GA

Sector

Geotechnical

Services

2020

In implementing the CDC Chamblee 2020 Master Plan, there are several buildings to be constructed at the Chamblee facility that are located on the property owned by the CDC and US Government. The buildings to be constructed include:
  • A 13-story office building located near existing Building 107
  • Parking Deck addition, a multi-story parking deck similar to adjacent parking decks
  • One story lab approximately 10,000 sf support building
  • A one story 1,000 sf guardhouse
  • Vehicle surface parking lot near construction site with 100 capacity
  • Security Drive extended east to Fifth Avenue from existing Building 107
Prior to construction, geotechnical/subsurface soils testing were necessary for these construction sites. Accura was awarded the contract to complete the geotechnical testing effort and report development. Field investigations were conducted that consisted of a subsurface investigation, characterization of subsurface materials, borings, rock cores (including depth to rock), laboratory testing and analyses. Work was performed in accordance with ASTM D1586. Once the data was collected, Accura developed a comprehensive geotechnical report that summarized the subsurface exploration and laboratory testing programs, site characterization, engineering analyses and recommendations for the geotechnical design and construction aspects of the planned facilities. An analysis of the existing site conditions was also contained in the report that included information such as surface drainage conditions and groundwater conditions and associated design or construction issues. All work was completed under the direct supervision of a registered professional geotechnical engineer.

Precision, Expertise, and Impact in Action

THIS IS A TEST
THIS IS A TEST
THIS IS A TEST
THIS IS A TEST

Our Role in the Mission

Accura played a key role in wetlands delineation, permitting, and environmental surveys to facilitate the repair and expansion of water and wastewater infrastructure. Our comprehensive approach included:

Conducting on-site investigations to assess environmental impact.

Preparing detailed permit applications for:

  • Stream stabilization/restoration across three critical water bodies&
  • The repair, replacement, and construction of new water and wastewater pipelines, including stream and wetland crossings.

Surveying threatened and endangered species, including the rare small whorled pogonia and wood turtle.

Modifying existing permits to meet updated compliance needs.

Challenges We Overcame

Working across the dynamic landscape of Fort Belvoir required:
Conducting compliance inspections under stringent environmental regulations.
Balancing infrastructure needs with environmental preservation.
Addressing multiple stream and wetland impacts (4-5 in total).

The Impact

Our work not only ensured compliance but also played a part in protecting the delicate ecosystem of Fort Belvoir. From securing permits to restoring streams, we enabled the U.S. Army to move forward with confidence, knowing their construction efforts align with their commitment to environmental stewardship.

SIMILAR CASE STUDIES

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.

OUR Partners