USACE Pre-Demolition Surveys

Client

Nasa

Location

Huntsville, Alabama

Sector

Environmental

Services

2019

ENVIRONMENTAL PROJECTS USACE Pre-Demolition Surveys Locations: Fort Drum, NY; Aberdeen Proving Ground, MD; Fort Belvoir, VA; and Fort Lee, VA. Accura provided support to the Huntsville Engineering Center in their efforts to reduce existing Army facilities as a part of the Facilities Reduction Program led by the Installation Management Command (IMCOM). Accura conducted pre-demolition assessments, which included Asbestos Containing Materials (ACM), Other Regulated Materials (ORM) and Lead-Based Paint (LBP) surveys at IMCOM installations at Fort Drum; Aberdeen Proving Ground; Fort Belvoir and Fort Lee. Accura planned and conducted the environmental sampling as well as quantified the environmental contamination an over 100 buildings and 1.1M square feet of space at the four installations on an expedited schedule.

Precision, Expertise, and Impact in Action

THIS IS A TEST
THIS IS A TEST
THIS IS A TEST
THIS IS A TEST

Our Role in the Mission

Accura played a key role in wetlands delineation, permitting, and environmental surveys to facilitate the repair and expansion of water and wastewater infrastructure. Our comprehensive approach included:

Conducting on-site investigations to assess environmental impact.

Preparing detailed permit applications for:

  • Stream stabilization/restoration across three critical water bodies&
  • The repair, replacement, and construction of new water and wastewater pipelines, including stream and wetland crossings.

Surveying threatened and endangered species, including the rare small whorled pogonia and wood turtle.

Modifying existing permits to meet updated compliance needs.

Challenges We Overcame

Working across the dynamic landscape of Fort Belvoir required:
Conducting compliance inspections under stringent environmental regulations.
Balancing infrastructure needs with environmental preservation.
Addressing multiple stream and wetland impacts (4-5 in total).

The Impact

Our work not only ensured compliance but also played a part in protecting the delicate ecosystem of Fort Belvoir. From securing permits to restoring streams, we enabled the U.S. Army to move forward with confidence, knowing their construction efforts align with their commitment to environmental stewardship.