Wetlands – Fort Belvoir

Client

Location

Fort Belvoir

Sector

Environmental

Services

2019

Wetlands Delineation & Surveys Client: US Army Location: Fort Belvoir, VA Accura provided wetlands delineation, threatened and endangered species surveys and permitting for construction activities of water and wastewater infrastructures. The project entails project site investigations and compliance inspections on sites throughout Fort Belvoir. We performed project and plan reviews to complete preparation of one permit application for stream stabilization/restoration projects on three streams to protect water and wastewater infrastructure; completed preparation of one permit application for repair, replacement and construction of new water and wastewater lines and utility right-of-way stream crossings, that will include 4-5 impacts to streams or wetlands. Accura completed a permit modification for an existing Nationwide permit along with a small whorled pogonia and wood turtle surveys.

Precision, Expertise, and Impact in Action

THIS IS A TEST
THIS IS A TEST
THIS IS A TEST
THIS IS A TEST

Our Role in the Mission

Accura played a key role in wetlands delineation, permitting, and environmental surveys to facilitate the repair and expansion of water and wastewater infrastructure. Our comprehensive approach included:

Conducting on-site investigations to assess environmental impact.

Preparing detailed permit applications for:

  • Stream stabilization/restoration across three critical water bodies&
  • The repair, replacement, and construction of new water and wastewater pipelines, including stream and wetland crossings.

Surveying threatened and endangered species, including the rare small whorled pogonia and wood turtle.

Modifying existing permits to meet updated compliance needs.

Challenges We Overcame

Working across the dynamic landscape of Fort Belvoir required:
Conducting compliance inspections under stringent environmental regulations.
Balancing infrastructure needs with environmental preservation.
Addressing multiple stream and wetland impacts (4-5 in total).

The Impact

Our work not only ensured compliance but also played a part in protecting the delicate ecosystem of Fort Belvoir. From securing permits to restoring streams, we enabled the U.S. Army to move forward with confidence, knowing their construction efforts align with their commitment to environmental stewardship.